A Preliminary Investigation of Trouble Shooting
Item
-
Title
-
A Preliminary Investigation of Trouble Shooting
-
Date
-
1953
-
Index Abstract
-
Coming Soon
-
Photo Quality
-
Undetermined
-
Report Number
-
HRRC TR 53-2
-
Creator
-
Saltz, Eli
-
Moore, John V.
-
Corporate Author
-
Human Resources Research Center
-
Extent
-
10
-
Identifier
-
AD0014441
-
AD Number
-
14441
-
Distribution Classification
-
1
-
DTIC Record Exists
-
No
-
Distribution Change Authority Correspondence
-
AFHRL LTR
-
Abstract
-
Line-maintenance personnel were interviewed, tested, and observed in the process of trouble shooting in 3 equipment areas: Q-24 radar, reciprocating engines, and remote-control turrets. The subject comprised the 5 best and the 5 poorest actual line trouble shooters (TS's) in each of the 3 areas, as determined by supervisor ratings. Good TS's knew more about the functioning of the equipment components than did poor TS's, and had participated in more different activities of all types. No demonstrable difference occurred between good and poor TS's on intelligence measures or ability to form abstract concepts.
-
Report Availability
-
Full text available by request
-
Date Issued
-
1953-02
-
Provenance
-
IIT
-
Type
-
report
-
Format
-
10 pages ; 28 cm.