Power Plant Installation Cooling Study Part III: Results of Steady State Analysis Volume IV
Item
-
Title
-
Power Plant Installation Cooling Study Part III: Results of Steady State Analysis Volume IV
-
Date
-
1954
-
Index Abstract
-
Not Available
-
Photo Quality
-
Not Needed
-
Report Number
-
WADC TR 55-414 Part III Volume IV
-
Corporate Author
-
Northrup Aircraft, Incorporated
-
Laboratory
-
Power Plant Laboratory
-
Extent
-
218
-
Identifier
-
AD0109812
-
Access Rights
-
ASTIA
-
Distribution Classification
-
2
-
Contract
-
AF 33(616)-2001
-
DoD Task
-
30231
-
DTIC Record Exists
-
No
-
Distribution Change Authority Correspondence
-
None
-
Distribution Conflict
-
No
-
Report Availability
-
Not available via Contrails
-
DoD Project
-
3071
-
Date Issued
-
1954-09
-
Abstract
-
The abstract for this report is either unavailable or has yet to be entered
-
Provenance
-
Bombardier/Aero
-
Type
-
report
-
Creator
-
Young, R. W.
-
Leith, R. S.