Calibration of the Gas Dynamics Facility Tunnel with Supply Pressures up to 60 psia and Mach Numbers from 1.4 to 2.5
Item
-
Title
-
Calibration of the Gas Dynamics Facility Tunnel with Supply Pressures up to 60 psia and Mach Numbers from 1.4 to 2.5
-
Date
-
1955
-
Index Abstract
-
Online
-
Photo Quality
-
Undetermined
-
Report Number
-
AEDC TN 54-45
-
Creator
-
Bond, Charles E.
-
Corporate Author
-
Arnold Engineering Development Center
-
Laboratory
-
Arnold Engineering Development Center
-
Extent
-
50
-
PB Number
-
PB116618
-
Identifier
-
AD0053008
-
Access Rights
-
Unknown
-
Distribution Classification
-
2
-
DTIC Record Exists
-
No
-
Distribution Change Authority Correspondence
-
None
-
Distribution Conflict
-
Yes
-
Index Price
-
$2.75
-
Index In
-
U.S. Government Research Reports, vol. 23, no. 4, p.147, 4/15/1955
-
Report Availability
-
Not available via Contrails
-
Date Issued
-
1955-01
-
Abstract
-
The abstract for this report is either unavailable or has yet to be entered
-
Type
-
report