Development Plan And Cost Estimate. Addendum To A Study Of An Orbital Maintenance And Material Transfer Shuttle

Item

Title
Development Plan And Cost Estimate. Addendum To A Study Of An Orbital Maintenance And Material Transfer Shuttle
Date
1964
Index Abstract
Not Available
Photo Quality
Not Needed
Report Number
RTD TDR 63-4057 Addendum
Creator
Goodall, Ray
Corporate Author
Lockheed Aircraft Corp Burbank Calif
Laboratory
Aetro Propulsion Laboratory
Extent
13
Identifier
AD0438028
Access Rights
OTS
Distribution Classification
1
Contract
AF 33(657)-10290
DoD Project
8170
DoD Task
817010
DTIC Record Exists
No
Distribution Change Authority Correspondence
None
Distribution Conflict
No
Date Modified
Scanned by request 1/18/2010 submitted by the National Aeronautics and Space Administration (NASA) (Government Agency - Domestic)
Abstract
This document is an addendum to RTD-TDR-63-4057, A Study of an Orbital Maintenance and Material Transfer Shuttle. The basic report presents a preliminary design of a one-man shuttle vehicle used to transport personnel and material between large space stations and to perform in-space maintenance operations. This addendum presents a Development Plan and a Cost Estimate for producing two shuttles. The development plan shows that the first operational flight could take place 28 months from go-ahead. A total cost of $15,000,000 is estimated. No new test facilities are required for the development of the shuttle.
Report Availability
Full text available
Is Referenced By
Jenkins, Dennis R., Dressing for Altitude: A.S. Aviation Pressure Suits - Wiley Post to Space Shuttle, NASA Special Publication 2011-595, NAS 1.21:2011-595, 2012
Date Issued
1964-03
Provenance
Lockheed Martin Missiles & Fire Control
Type
report
Format
1 online resource