Calibration of the 100-Inch Hypervelocity Tunnel (F)

Item

Title
Calibration of the 100-Inch Hypervelocity Tunnel (F)
Date
1963
Index Abstract
Coming Soon
Photo Quality
Incomplete
Report Number
AEDC TDR 63-46
Creator
Ball, Henry W.
Corporate Author
ARO, Inc.
Extent
28
Identifier
AD0298279
Distribution Classification
1
Contract
AF 40(600)-1000
DoD Project
None Given
DoD Task
None Given
DTIC Record Exists
No
Distribution Change Authority Correspondence
None
Report Availability
Full text available by request
Date Issued
1963-03
Abstract
The abstract for this report is either unavailable or has yet to be entered
Publisher
Arnold Air Force Station, TN : Arnold Engineering Development Center, Air Force Systems Command, United States Air Force
Provenance
IIT
Type
report
Format
28 pages ; 28 cm.