Evaluation of Throat Materials in the Hotshot Tunnel F
Item
-
Title
-
Evaluation of Throat Materials in the Hotshot Tunnel F
-
Date
-
1964
-
Index Abstract
-
Coming Soon
-
Photo Quality
-
Incomplete
-
Report Number
-
AEDC TDR 64-56
-
Creator
-
Smithson, H. K.
-
Corporate Author
-
ARO, Inc.
-
Extent
-
11
-
Identifier
-
AD0433670
-
Distribution Classification
-
1
-
Contract
-
AF 40(600)-1000
-
DoD Project
-
None Given
-
DoD Task
-
None Given
-
DTIC Record Exists
-
No
-
Distribution Change Authority Correspondence
-
None
-
Abstract
-
Several experimental throat materials were tested in the 100-in. Tunnel F. Results of these tests showed that tungsten and copper-filled tungsten were more satisfactory than other materials investigated.
-
Report Availability
-
Full text available by request
-
Date Issued
-
1964-03
-
Publisher
-
Arnold Air Force Station, TN : Arnold Engineering Development Center, Air Force Systems Command, United States Air Force
-
Provenance
-
IIT
-
Type
-
report
-
Format
-
11 pages ; 28 cm.