Notes on Combinatorial Mathematics: An Estimate of Expected Critical Path Length in PERT Networks

Item

Title
Notes on Combinatorial Mathematics: An Estimate of Expected Critical Path Length in PERT Networks
Creator
Lindsey, John H.
Date
1970
Identifier
AD0713946
AD0713946
Abstract
PERT (Program Evaluation and Review Technique), a much-used management control technique for scheduling and administering large projects, has been applied to numerous defense programs in which the problem of treating schedule uncertainties during the development phase is troublesome. This report supplies a new estimate of the expected time required to complete an entire project, assuming that the times required to carry out the various subprojects are uncertain. A method is described for obtaining an approximation of the expected duration time of a project whose individual job times are discrete random variables.
Date Issued
1970-10
Extent
36
Contract
F44620-67-C-0045
Distribution Conflict
No
Access Rights
THIS DOCUMENT HAS BEEN APPROVED FOR PUBLIC RELEASE AND SALE; ITS DISTRIBUTION IS UNLIMITED.
Photo Quality
Not Needed
Distribution Classification
1
DTIC Record Exists
Yes
Report Availability
Full text available by request
Corporate Author
RAND Corporation
Provenance
IIT
Type
report
Format
36 pages ; 28 cm.