Truck Design Optimization Project. Phase II: Introductory Report
Item
-
Title
-
Truck Design Optimization Project. Phase II: Introductory Report
-
Creator
-
Cappel, Klaus
-
Date
-
1978
-
Identifier
-
PB288739
-
Abstract
-
The Truck Design Optimization Project (TDOP) Phase II is being conducted to establish the performance and cost-effectiveness of premium freight car trucks with reference to the standard three-piece truck. This report sets up a framework for quantitative characterization of truck performance and outlines a method for collecting economic data. Means of achieving these objectives by road-testing, mathematical modeling, and review of maintenance and operational data are described. An important goal of the project is to supply the railroad industry with a basis for performance specifications for freight car trucks.
-
Date Issued
-
1978-11
-
Extent
-
110
-
Corporate Author
-
Wyle Laboratories
-
Corporate Report Number
-
TDOP TR-03
-
Report Number
-
FRA/ORD-78/53
-
PB Number
-
PB288739
-
Contract
-
DOT-FR-742-4277
-
NTRL Accession Number
-
PB288739
-
Distribution Conflict
-
No
-
Access Rights
-
Document is available to the U.S. public through the National Technical Information Service Springfield, Virginia 22161
-
Photo Quality
-
Not Needed
-
Distribution Classification
-
1
-
DTIC Record Exists
-
No
-
Report Availability
-
Full text available by request
-
Provenance
-
S. Kumar
-
Type
-
report