Cost & Schedule Control Systems Criteria for Contract Performance Measurement

Item

Title
Cost & Schedule Control Systems Criteria for Contract Performance Measurement
Report Number
DOE/MA-0155
Corporate Author
U.S. department of Energy, Assistant Secretary, Management and Administration, Director of Administration, Office of Project and Facilities Management
Date
1984
Date Issued
1984-05
Date Modified
Scanned and posted 2024-01-18
Extent
56
NTRL Accession Number
DE84012576
Identifier
DE84012576
Format
1 online resource
Abstract
The purpose of this pamphlet is to inform interested DOE and industry personnel about the basic concepts and general requirements of the Cost and Schedule Control Systems Criteria (CSCSC) of DOE Order 2250.1A. the CSCSC do not represent a management system nor do they prescribe specific methods of organization or operation. The criteria are intended to serve as standards of measuring adequacy of management control systems. Objectives in using the criteria are: (1) to provide an accurate status of contract progress; (2) to provide early visibility to problems - prevent surprises; (3) to improve estimated final cost projections; (4) to improve on shortcomings of prior requirements; and (5) to minimize proliferation of systems and data problems. The CSCSC contain thirty-five criteria which are grouped into five categories: organization; planning and budgeting; accounting; analysis; and revisions and access to data. (ERA citation 09:034976)
Description
The purpose of this pamphlet is to inform interested DOE and industry personnel about the basic concepts and general requirements of the Cost and Schedule Control Systems Criteria (CSCSC) of DOE Order 2250.1A. the CSCSC do not represent a management system nor do they prescribe specific methods of organization or operation. The criteria are intended to serve as standards of measuring adequacy of management control systems. Objectives in using the criteria are: (1) to provide an accurate status of contract progress; (2) to provide early visibility to problems - prevent surprises; (3) to improve estimated final cost projections; (4) to improve on shortcomings of prior requirements; and (5) to minimize proliferation of systems and data problems. The CSCSC contain thirty-five criteria which are grouped into five categories: organization; planning and budgeting; accounting; analysis; and revisions and access to data. (ERA citation 09:034976)
Distribution Classification
1
Distribution Conflict
No
DTIC Record Exists
No
Illinois Tech Related
No
Photo Quality
Microfiche
Report Availability
Full text available
Type
report
Media
DE84012576